LEAKAGE REDUCTION GROUTING DURING TBM TUNNEL CONSTRUCTION. TBM tunneling complex leakage reduction grouting technology 1. Project Background After commencing TBM...
Read More
Sample Code
Sealing and Consolidation Grouting of Colluvial Strata at Tunnel Exit
SEALING AND CONSOLIDATION GROUTING OF COLLUVIAL STRATA AT TUNNEL EXIT Exit Dual-tube double-packer grouting reinforcement technology for colluvial rock layer...
Read More
Pipe Roof Resin Grouting for Tunnel Excavation
PIPE ROOF RESIN GROUTING FOR TUNNEL EXCAVATION Rapid pre-Support pipe roof grouting reinforcement technology 1. Prokect Background At a tunnel...
Read More
Tunnel Auxiliary Safety Passage Seepage Reduction Grouting
TUNNEL AUXILIARY SAFETY PASSAGE SEEPAGE REDUCTION GROUTING Composite grouting and seepage reduction technology for highly permeable rock formations 1 Project...
Read More
Grout Filling Flexible Joints Between TBM Tunnel and Work Shaft
GROUT FILLING FLEXIBLE JOINTS BETWEEN TBM TUNNEL AND WORK SHAFT Void filling and plugging technology between tunnel structure interface and...
Read More
Protective Grouting for Tunnel Excavation in Fractured Rock Formation
PROTECTIVE GROUTING FOR TUNNEL EXCAVATION IN FRACTURED ROCK FORMATION Pre-construction pipe-roof support grouting reinforcement 1. Project Background A tunnel was...